Frequently Asked Questions (FAQ)

Question:
UNC-bldr230329002794 adding master bed room and two car garage to existing single story house. I need to clear permit to obtain bldg permit. can not find how to apply for GMED clearance or link for geo tech report exemption.

Answer:
The Agency Referral sheet from Building and Safety under Geotechnical and Materials Engineering Division (GMED) provides the website to upload documents for GMED review. At a minimum, you will need to upload the Agency Referral sheet, and the building/grading plans for the project. Include any geotechnical reports, if you have them.