GET INVOLVED
|
-
Proposition 1E, Round 2 Stormwater Flood Management Grant Application Littlerock Reservoir Sediment Removal Project
(PDF, 58mb)
-
Salt/Nutrient Management Plan - Scope of Work
(PDF, 24 kb)
-
Proposition 1E Stormwater Flood Management Grant application - City of Palmdale(PDF, 6.44 mb)
-
Proposition 84 Implementation Grant Application for the AVEK Water Supply Stabilization Project No. 2
(PDF, 34.9 mb)
-
2010 Integrated Urban Water Management Plan for the Antelope Valley
(LACDPW and QHWD, PDF, 18.1 mb)
-
Antelope Valley-East Kern Water Agency (AVEK) 2010 Urban Water Management Plan
(AVEK, PDF, 3.91 mb)
-
2005 Integrated Urban Water Management Plan for the Antelope Valley
(LACDPW, RCSD, QHWD, and LACSD, 2005, 51 mb)
-
Palmdale Water District 2005 Urban Water Management Plan
(PWD, 2005, 7 mb)
-
Antelope Valley-East Kern Water Agency (AVEK) 2005 Urban Water Management Plan
(AVEK, 2005, 7 mb)
-
California Water Plan
(DWR, 2005, 2 mb)
-
Vertical-Deformation, WaterLevel, Microgravity, Geodetic, Water-Chemistry, and Flow-Rate Data Collected During Injection, Storage, and Recovery Tests at Lancaster, Antelope Valley, California, September 1995 through September 1998
(USGS, 2002, 8 mb)
-
Simulation of Ground-Water Flow and Land Subsidence, Antelope Valley Ground-Water Basin, California
(USGS, 2003, 11 mb)
-
Processes Affecting the Trihalomethane Concentrations Associated with the Third Injection, Storage, and Recovery Test at Lancaster, Antelope Valley, California, March 1998 through April 1999
(USGS, 2003, 2 mb)
-
California's Groundwater Bulletin 118 Update 2003
(DWR, 2003, 19 mb)
-
Antelope Valley Spreading Grounds Study
(LACDPW, 1999, 1.2 mb)
-
Antelope Valley Area Plan
(LACDRP, 1986, 12 mb)
-
Kern County General Plan
(KCPD, 2004, 173 kb)
-
Kern County General Plan Appendices
(KCPD, 2004, 27 mb)
-
Simulation of Ground-Water Flow and Land Subsidence, Antelope Valley Ground-Water Basin, California
(USGS, 2003, 11 mb)
- Dist 40 Master Plan
(LACDPW, 1999, 8 mb)
- Planned Utilization of Water Resouces in Antelope Valley 1980
(DWR, 1980, 4 mb)
- Study of Potential Recharge Sites in the Antelope Valley
(AVSWCA, 2002, 18.2 mb)
- 2005 State Water Project Delivery Reliability Report
(DWR, 2006, 6 mb)
- Antelope Valley Water Resource Study
(AVWG, 1995, 17.6 mb)
- Final Facilities Planning Report, Antelope Valley Recycled Water Project
(LACWWD, 2006, 30.4 mb)
- Land Use and Water Use in the Antelope Valley, California
(USGS, 1995, 9.5 mb)
- Antelope Valley Groundwater Recharge Study, Phase 2
(LACDPW, 1991, 5.71 mb)
- Water Resources of the Antelope Valley-East Kern Water Agency, California
(AVEK, 1967, 2.59 mb)
- Calibration of a Mathematical Model of the Antelope Valley Ground-Water Basin, California
(DWR, 1978, 3.40 mb)
- Antelope Valley Groundwater Basin
(DWR, 2004, 0.033 mb)
- Los Angeles County Farm Bureau
(LACFB, 2007, 0.58 mb)
- Groundwater Recharge Feasibility Study
(City of Lancaster, 2007, 12.6 mb)
- Final Program EIR, North LA/Kern County Regional Recycled Water Project
(LACWWD, 2008)
- Prop 50, Chap 8, Round 2 - Antelope Valley Regional Water Management Group's comment letter to the State
(0.18 mb)
- Prop 50, Chap 8, Round 2 - Los Angeles County Supervisor Michael D. Antonovich's Letter To California Department of Water Resources
(0.6 mb)
- Prop 50, Chap 8, Round 2 - Los Angeles County Supervisor Michael D. Antonovich's Letter To California State Water Resources Control Board
(0.6 mb)
- Prop 50 - Round 2, Step 1 Grant Application - Transmittal Letter
(0.07 mb)
-
Prop 50 - Round 2, Step 1 Grant Application - Attachment 1
- Prop 50 - Round 2, Step 1 Grant Application - Attachment 2
(0.2 mb)
- Prop 50 - Round 2, Step 1 Grant Application - Attachment 3
(0.2 mb)
- Prop 50 - Round 2, Step 1 Grant Application - Attachment 4
(0.4 mb)
- Prop 50 - Round 2, Step 1 Grant Application - Attachment 5
(0.2 mb)
- Prop 50, Chap 8, Round 2 - Letters to DWR - AV IRWM Letter to DWR
(0.1 mb)
- Prop 50, Chap 8, Round 2 - Letters to DWR - Enclosures to IRWM Letter to DW
(2 mb)
- Prop 50 - Planning Grant PSP
(1.1 mb)
- Prop 50 - Implementation Grant, Step 1
(1.2 mb)
- Prop 50 - Implementation Grant, Step 2
(0.4 mb)
-
Antelope Valley Final Report on the Comprehensive Plan of Flood Control and Water Conservation
(LACDPW, 1987, 2.5 mb)
|
|