Projects
Sort by:
Status |
Name
Upcoming Projects
170th Street East Slurry Seal: 1. Reconstruct/Rehabilitate AC pavement, as per GMED recommendation (in 2009 GMED recommended reconstruction), of existing Class I side paths.
2. Update bikeway signing and striping as necessary, including installation of Class IV protected bike lane configuration, as appropriate, to provide bikeway continuity.
Amar Rd Complete Street Project: Develop Amar Road into a complete street by installing new curb ramps and curb ramp extensions; build new sidewalks, renovate existing medians/service islands and install new raised medians; resurface the road and install new bicycle lanes and crosswalk striping; and install wayfinding signages and monument signs. . Construction is estimated to finish in Spring 2028. Total bike facilities of 2.00 mile(s).
Bike Path Pavement Rehabilitation-Admiralty Way: Bike Path Rehabilitation. Construction is estimated to finish in Summer 2023. Total bike facilities of 1.02 mile(s).
Colima Rd - City of Whittier Boundary to Fullerton Rd: Median Reconst, Restriping, T/S Upgrade. Construction is estimated to finish in Summer 2027. Total bike facilities of 3.50 mile(s).
Compton Creek - Artesia Blvd Connection: construct bike paths along Santa Fe Avenue. Total bike facilities of 0.17 mile(s).
E Pasadena and E San Gabriel Bikeway Access Improvements: Installation of Class II bike lanes along Colorado Blvd, San Pasqual St, and Rosemead Blvd. and enhanced Class III bike routes along Del Mar Blvd, Ardendale Ave, Longden Ave, and Madre St/Muscatel Ave.
. Construction is estimated to finish in Fall 2029. Total bike facilities of 5.17 mile(s).
Eaton Wash Bike Path - Phase 1: Bike Path. Construction is estimated to finish in Fall 2028.
Florence Neighborhood Mobility (AHSC): Install bulb-outs, ADA ramps, trees, wayfinding signages, street lights, bike blvd, and bus stop improvements. Repair sidewalks. Construction is estimated to finish in Spring 2026.
Los Angeles River Bike Path Phase 2: Construction of bike path and access ramp. Construction is estimated to finish in Fall 2031.
Metro Gold Line Eastside Access Phase II: Construction of curb and gutter, sidewalk, curb ramps, cross gutters, stamped and colored concrete, irrigation systems, and landscaping; installation of striping and pavement markings; and the performance of other appurtenant work. Construction is estimated to finish in Fall 2027. Total bike facilities of 3.32 mile(s).
Metro Willowbrook Rosa Parks Station Improvement-Plan Review: PLan Review.
Puente Creek Bikeway: Construct 1.86 miles Class I bike path and enhance 0.37 miles bicycle route/Class 3. Construction is estimated to finish in Fall 2026. Total bike facilities of 2.30 mile(s).
Rosemead Bl Complete Street Improvements Ph 1: Develop preliminary design and obtain environmental clearance for a complete streets treatment with bike lanes and ADA-compliant accessibility. Construction is estimated to finish in Spring 2029.
San Jose Creek Bike Path Pomona Phase 1: Construct Bikepath along Puente Creek.
San Jose Creek Bike Path Pomona Phase 2: Construct Bike Path along San Jose Creek.
San Jose Creek Regional Access: Class I bike path and multi-use trail from Duck Farm River Park to existing equestrian trail and San Jose Creek Trail. Construct a new multi-use bridge over the San Jose Creek. Construction is estimated to finish in Spring 2030.
Santa Fe Av-Artesia Bl to Del Amo Bl: Resurf and Reconst. Construction is estimated to finish in Fall 2029.
Santa Fe Spur BP - Connection to Duarte Rd: 1. Grade and recompact existing base, install 10' or 12' wide paved AC bike path.
South Whittier Community Bikeway Access Improvements: Class II Bike Lanes and Class III Bike Boulevards. Construction is estimated to finish in Summer 2027. Total bike facilities of 4.93 mile(s).
The Old Rd over Santa Clara River and SPT CO Bridge et al: Bridge Replacement, Road Construction, and Multiuse Trail. Construction is estimated to finish in Fall 2026. Total bike facilities of 3.12 mile(s).
Washington Bl et al: Road Resurfacing. Construction is estimated to finish in Spring 2026.
West Carson Community Bikeways: Class II Bike Lanes and Class III Bike Route, and pavement resurfacing. Construction is estimated to finish in Fall 2022. Total bike facilities of 1.65 mile(s).
West Whittier Los Nietos Mines Boulevard et al: Resurface 3.0 miles of major roadways including parkway improvements and curb ramp upgrades . Construction is estimated to finish in Fall 2024. Total bike facilities of 2.46 mile(s).
Willowbrook 2 Project (AHSC) : Installation of new bike lanes, bulbouts, ADA ramps, new sidewalks and sidewalk repairs, street trees, wayfinding signs, street lights and bus stop improvements. Construction is estimated to finish in Spring 2025.
Projects In Progress
Huntington Drive - San Gabriel Bl/132' West of Michillinda Avenue: Construction of asphalt rubber hot mix on new asphalt concrete, curb and gutter, sidewalk, driveways, curb ramps and bioswale structures; cold milling; installation of striping and pavement markings, including buffered bike lanes; installation of new traffic signal; landscape medians; drainage work; and the performance of other appurtenant work.
Marvin Braude Beach Trail Gap Closure: Construct 0.6 mile pathway and connect with City of Santa Monica's multi-use trail.
Rosemead Boulevard Interim Complete Streets: Installation of Class IV bikeway .
Vincent Community Bikeways: Implementation of bike facilities and proposed road diet. Installation of high-visibility crosswalks and wayfinding signs.
. Total bike facilities of 4.48 mile(s).
Projects Completed Since 2012
108th Street, et al.: Roadway resurfacing; Reconstruction of curb and gutter, sidewalk, driveways, curb ramps, cross gutters, and alley intersections; installation of striping and pavement markings; modification of traffic signals; replace 24-inch CMP, and the performance of other appurtenant work. Total bike facilities of 1.75 mile(s).
124th Street, et al.: reconstruction of roadway pavement using cold central plant recycled asphalt concrete pavement; construction of sidewalk, driveways, curb and gutter, curb ramps, and cross gutters; installation of striping and pavement markings; and the performance of other appurtenant work . Total bike facilities of 2.96 mile(s).
Budlong Avenue - Manchester Avenue to El Segundo Boulevard: Construction of asphalt concrete pavement on base material, sidewalk, curb ramps, and drainage structures; reconstruction of curb, gutter, and driveways; modification of traffic signals; installation of striping and pavement markings; and the performance of other appurtenant work.
Castlegate Avenue, et al. (JOC): Chip sealing, slurry sealing, microsurfacing, and micro-milling of existing pavement; installation of striping and pavement markings; and the performance of other appurtenant work.
Charter Oak Bikeway Access Improvements: Construction of curb and gutter, asphalt concrete pavement on base material, and river rock; installation of striping and pavement markings; and the performance of other appurtenant work.
Colima Road - La Mirada Boulevard to Leffingwell Road: resurfacing of roadway pavement; installation of striping and pavement markings; and the performance of other appurtenant work . Total bike facilities of 1.43 mile(s).
Dockweiler RV Park Bicycle Path Bypass-Grant No.58L6-14-2427: Construction of a concrete pavement on base material and stabilization geotextile and asphalt concrete pavement on base material; and the performance of other appurtenant work. Total bike facilities of 0.22 mile(s).
East Los Angeles Community Safe Routes to School : Bike boulevard and bike route. Total bike facilities of 1.91 mile(s).
Eastside Light Rail Bike Interface: Construction of curb and gutter, sidewalk, curb ramps, permeable pavers, river rock paving, and drainage structures; installation of traffic signals and striping and pavement markings; and the performance of other appurtenant work. Total bike facilities of 6.38 mile(s).
El Segundo Boulevard - Avalon Boulevard to Central Avenue, et al.: Cold-in-place recycling of existing asphalt concrete pavement; resurfacing of the roadway with asphalt rubber hot mix; reconstruction of curb and gutter, sidewalk, driveways, and curb ramps; construction of bioswales; installation of striping and pavment markings; landscaping; and the performance of other appurtenant work. Total bike facilities of 1.51 mile(s).
Emerald Necklace Bike Trail: Construction of an asphalt concrete on base material, application of quick-set emulsion aggregate slurry, installation of striping and pavement marking; and the performance of other appurtenance.
Firestone Boulevard - Central Avenue/Graham Avenue, et al.: Resurfacing of roadway pavement; construction of an asphalt rubber and aggregate membrane interlayer; reconstruction of medians, curb and gutter, sidewalk, driveways, and curb ramps; installation of striping and pavement markings; traffic signal modifications; and the performance of other appurtenant work. Total bike facilities of 5.52 mile(s).
Florence Metro Blue Line Station Bikeway Access Improvements: Improve bicycle access to the Florence Metro Blue Line Station along Miramonte Boulevard, Maie Avenue, 68th Street and Crockett Boulevard in the Florence-Firestone community. . Total bike facilities of 3.06 mile(s).
Gorman Post Road, et al. - Phase 2: Reconstruction & resurfacing of roadway pavement with asphalt concrete, asphalt rubber & aggregate membrane, & asphalt rubber hot-mix with a warm mix additive; construction of concrete bus pads, sidewalk, & curb; reconstruction of curb & gutter; modification of traffic signals; installation of rubber sidewalk pavers & striping & pavement markings; & the performance of other appurtenant work.
Holmes Ave -Slauson Ave/Gage Ave: Traffic Calming -reducing the number of existing travel lanes from two to one in each direction in order to accommodate a continuous two-way left turn lane and bike lane.
La Brea Avenue, et al.: Resurfacing of roadway pavement with asphalt rubber hot mix; construction of curb and gutter, sidewalk, curb ramps, catch basin, and inductive loop detectors; installation of striping and pavement markings; and the performance of other appurtenant work .
Los Palacios Drive, et al.: the reconstruction of roadway pavement using cold central plant recycled asphalt concrete pavement; resurfacing of roadway pavement using asphalt rubber hot mix; construction of sidewalk, driveways, curb and gutter, curb ramps, and cross gutters; and the performance of other appurtenant work .
Mureau Road Bikeway and Roadway Improvements: Reconstruction of roadway pavement with asphalt concrete pavement and microsurfacing; construction of drainage structures and guardrail end treatments; installation of striping and pavement markings; and the performance of other appurtenant work.
New York Drive - Lake Avenue/120 feet W/o Altadena Drive: Reconstruction of roadway pavement, curb and gutter, driveways, sidewalk, and curb ramps; construction of a storm drain system; guardrail; modification of traffic signals; installation of striping and pavement markings; and the performance of other appurtenant work . Total bike facilities of 3.37 mile(s).
Quartz Hill Elementary School Traffic Improvements: Traffic improvements include new sidewalk and crosswalk modifications, Class II bicycle lane, drainage upgrades, and a driver feedback sign. .
Sinaloa Avenue, et al.: Resurfacing of asphalt concrete pavement; micro-milling of existing asphalt concrete pavement; construction of an asphalt rubber and aggregate membrane and polymer modified emulsion-reclaimed asphalt pavement aggregate slurry seal; and the performance of other appurtenant work. Total bike facilities of 6.89 mile(s).
Slauson Avenue Revitalization: Resurfacing of roadway pavement tire rubber modified asphalt concrete; reconstruction of curb and gutter, sidewalk, driveways,and curb ramps; construction of concrete pavement and crosswalks, and streetscape improvements; and the performance of other appurtenant work.
Susana Road, et al.: Construction of tire rubber modified asphalt concrete and cold central plant recycled asphalt concrete pavement on cement stabilized pulverized base; reconstruction of curb and gutter, sidewalk, driveways, and curb ramps on crushed miscellaneous base material; modification of traffic signals; striping and pavement markings; and the performance of other appurtenant work. . Total bike facilities of 1.84 mile(s).
The Old Road - Royal Road to Oak Valley Road: Mill 2" Existing AC and Pave 2" AC to preserve roadway and improve rideability and life of the roadway.
Traffic Improvements near Eastman Elementary School: Construction of speed cushions, curb and gutter bulb outs, and asphalt concrete pavement on base material; modification of traffic signals; installation of striping and pavement markings; and the performance of other appurtenant work.
Vermont Avenue Bike Lane: Construction of curb and gutter, asphalt concrete pavement and concrete pavement on base material; modification of traffic signals; installation of striping and pavement markings; and the performance of other appurtenant work.
Vermont Avenue Median Landscaping, Phase 2: Landscaping of roadway medians; construction of electrical conduit, irrigation systems, inductive loop detectors, and monument signs; installation of striping and pavement markings; and the performance of other appurtenant work.
Westmont Community Bikeway Access Improvements: Construction of asphalt concrete pavement on base material, curb and gutter, sidewalk, curb ramps, and cross gutters; installation of striping and pavement markings; and the performance of other appurtenant work. Total bike facilities of 1.74 mile(s).
Willowbrook Area Access Improvements: Reconstruction of roadway pavement, construction of curb and gutter, sidewalk, driveways, and curb ramps; landscaping; irrigation system; signage and streetscape improvements; and the performance of other appurtentant work.
.
Woodbury Road Median Landscaping: reconstruction of curb and gutter; construction of landscaping, irrigation systems, installation of striping and pavement markings, and the performance of other appurtenant work .
Workman Mill Road: Cold milling and resurfacing of roadway pavement with asphalt rubber hot mix on asphalt rubber and aggregate membrane; construction of a Portland cement concrete bus pad; reconstruction of curb and gutter, sidewalk, curb ramps, and driveway; traffic signal modifications; striping and pavement markings; and the performance of other appurtenant work. Total bike facilities of 1.01 mile(s).
For more information on County bikeway projects, please contact us. Please note that planned on-road bikeways are implemented in conjunction with road reconstruction projects whenever feasible. |