ON THIS PAGE
Project Summary
In response to requests received from the community, Public Works completed a traffic study to evaluate the traffic control devices at the intersection of Mount Vernon Drive and Verdun Avenue in the unincorporated community of View Park-Windsor Hills. The traffic study included field observations, a review of the collision history on file with the California Highway Patrol, a review of existing signage, and an analysis of vehicular speeds and volumes on Mount Vernon Drive and Verdun Avenue.
Based on the results of the study, Public Works determined that the intersection of Mount Vernon Drive and Verdun Avenue is a viable candidate for the installation of multi-way stop controls to assist motorists in assigning right-of-way. When properly used, multi-way stop controls are valuable devices for the control of vehicular and pedestrian traffic. They provide for the orderly movement of traffic and may reduce the frequency and severity of certain type of collisions.
Before Photos






After Photos
Coming soon.
Project Schedule
Final Plans – Fall 2024
Start of Construction – Spring 2025
*Project schedule subject to change.