Thank you for participating in the Phase II LA County Bicycle Master Plan survey!

We appreciate your valuable input, which plays a crucial role in developing safe and accessible bikeways and paths enhancing connectivity within unincorporated Los Angeles County and along County flood control district channels.

If you are our $200 gift card or bike winner, look out for a congratulation email from Alan Rodriguez.

How was the draft unconstrained network developed?

The draft network development was guided by our two guiding principles of safety and connectivity and considered the factors below. Read more about our Draft Network Methodology.

The draft network aims to:

  • Connect riders to key destinations, transit, and existing or planned bikeways
  • Address concerns from community members from previous engagement
  • Utilize bike facility best practices based on the existing conditions of the roads and the land uses around the road (for example, residential, commercial, etc.)
  • Provide safe and comfortable routes for bicyclists of all ages and abilities