Documents
Prop 84 IRWM Plan Update and Related Documents
- GLAC IRWM 2014 Plan Update – Final Draft
- Final Draft Documents
- Subregional Plan – Integration (Lower SG LA) 2012-11-30 Draft (PDF: 1 MB)
- Subregional Plan – Integration (NSMB) 2012-11-30 Draft (PDF: 0.7 MB)
- Subregional Plan – Integration (South Bay) 2012-11-30 Draft (PDF: 0.7 MB)
- Subregional Plan – Integration (ULAR) 2012-11-30 Draft (PDF: 0.4 MB)
- Subregional Plan – Integration (USGRH) 2012-11-30 Draft (PDF: 0.4 MB)
- Open Space for Habitat and Recreation Plan – Revised 12/29/12
- Appendix A Planing Documents Reviewed
- Appendix B Wetland Habitat Target Methodologies
- Appendix C Upland Habitat Target Methodology
- Appendix D Existing Park Recreationand Open Space
- Appendix E Existing and Proposed Greenways Parkways and Bikeways
- Appendix E part 2
- Appendix F Benefit Evaluation Tool
- Appendix G Estimating Benefits Methodology
- Appendix H IRWMP Project Evaluation Criteria for Habitat
- Appendix I IRWMP Project Evaluation Criteria for Rec
- Appendix J Glossary
- OSHARP 12-14-12
- OSHARP Comments SLL
- Open Space for Habitat and Recreation Plan – Final Draft 2012-08-22
- Open Space for Habitat and Recreation Plan Appendices – Final Draft 2012-08-22
- Subregional Plan (Lower SG LA) 2012-07-10 Draft (PDF: 6 MB)
- Subregional Plan (Lower SG LA) 2012-12-13 Final (PDF: 2.7 MB)
- Subregional Plan (NSMB) 2012-07-10 Draft (PDF: 3 MB)
- Subregional Plan (NSMB) 2012-12-13 Final (PDF: 2.6 MB)
- Subregional Plan (South Bay) 2012-07-10 Draft (PDF: 6 MB)
- Subregional Plan (South Bay) 2012-12-13 Final (PDF: 1.9 MB)
- Subregional Plan (ULAR) 2012-07-10 Draft (PDF: 3 MB)
- Subregional Plan (ULAR) 2012-12-13 Final (PDF: 3 MB)
- Subregional Plan (USGRH) 2012-08-14 Draft (PDF: 3 MB)
- Subregional Plan (USGRH) 2012-12-13 Final (PDF: 3 MB)
- Flood TM 2012-08-12 (PDF: 10 MB)
- Flood TM FINAL Feb 22 2013 (PDF: 1.8 MB)
- Supply TM 2012-08-14 (PDF: 1.51 MB)
- Targets and Objectives Supply TM FINAL (PDF: 344 KB)
- Surface Water Quality TM 2012-06-27 (PDF: 2 MB)
- Surface WQ TM FINAL Feb 8 2013 (PDF: 2.0 MB)
- GLAC IRWMP Comment Form
- DAC Outreach, Maywood Reports
- DAC Outreach Evaluation Study – Final Draft (Jan 2014)
- Report for 2nd round of IRWM Strategic Plan Workshops
Organizational Structure
- 2008 Legislative Principles (PDF: 8 KB)
- IRWMP Cities by Sub-region (PDF: 15 KB)
- Leadership Committee
- Memorandum of Understanding
- 1 Memorandum of Understanding – Regional Water Management Group 2016
- 2 Memorandum of Understanding – Regional Water Management Group 2013
- 3 Memorandum of Understanding – Regional Water Management Group 2008
- 4 Memorandum of Understanding Executed as of July 2007
- 5 Memorandum of Understanding Signatories as of July 2007
- Regional Water Management Group Interim Guidelines (PDF: 23 KB)
Meeting Information
Grant Applications and Related Documents
Prop 84
- Planning Grant
- Round 1
- Prop 84 Round 1 Grant Agreement Revised June 2016
- Prop 84 Round 1 Implementation Grant Application
- Attachment 01. Authorization and Eligibility Requirements 1 of 1
- Attachment 02. Adopted Plan and Proof of Formal 1 of 2
- Attachment 02. Adopted Plan and Proof of Formal 2 of 2
- Attachment 03. Work Plan 1 of 5
- Attachment 03. Work Plan 2 of 5
- Attachment 03. Work Plan 3 of 5
- Attachment 03. Work Plan 4 of 5
- Attachment 03. Work Plan 5 of 5
- Attachment 04. Budget 1 of 1
- Attachment 05. Schedule 1 of 1
- Attachment 06. Monitoring, Assessment, and Performance Measures 1 of 1
- Attachment 07. Economic Analysis – Water Supply Costs and Benefits 1 of 1
- Attachment 08. Water Quality and Other Expected Benefits
- Attachment 09. Economic Analysis – Flood Damage Reduction Costs and Benefits
- Attachment 10. Cost and Benefits Summary 1 of 1
- Attachment 11. Program Preferences 1 of 1
- Attachment 12. Disadvantaged Community Assistance 1 of 1
- Attachment 13. AB 1420 and Water Meter Compliance Information 1 of 1
- Attachment 14. Consent Form 1 of 1Attachment 15. Deltawater 1 of 1
- Round 2
- Prop 84 Round 2 Implementation Grant Application
- Attachment 1 Eligibility Documents 1 of 1
- Attachment 10 DAC 1 of 1
- Attachment 11 Self Certification 1 of 1
- Attachment 13 Delta 1 of 1
- Attachment 2 Consent 1 of 1
- Attachment 3 WorkPlan 1 of 13
- Attachment 3 WorkPlan 2 of 13
- Attachment 3 WorkPlan 3 of 13
- Attachment 3 WorkPlan 4 of 13
- Attachment 3 WorkPlan 5 of 13
- Attachment 3 WorkPlan 6 of 13
- Attachment 3 WorkPlan 7 of 13
- Attachment 3 WorkPlan 8 of 13
- Attachment 3 WorkPlan 9 of 13
- Attachment 3 WorkPlan 10 of 13
- Attachment 3 WorkPlan 11 of 13
- Attachment 3 WorkPlan 12 of 13
- Attachment 3 WorkPlan 13 of 13
- Attachment 4 Budget 1 of 1
- Attachment 5 Schedule 1 of 1
- Attachment 6 Measures 1 of 1
- Attachment 7 Technical Justification 1 of 15
- Attachment 7 Technical Justification 2 of 15
- Attachment 7 Technical Justification 3 of 15
- Attachment 7 Technical Justification 4 of 15
- Attachment 7 Technical Justification 5 of 15
- Attachment 7 Technical Justification 6 of 15
- Attachment 7 Technical Justification 7 of 15
- Attachment 7 Technical Justification 8 of 15
- Attachment 7 Technical Justification 9 of 15
- Attachment 7 Technical Justification 10 of 15
- Attachment 7 Technical Justification 11 of 15
- Attachment 7 Technical Justification 12 of 15
- Attachment 7 Technical Justification 13 of 15
- Attachment 7 Technical Justification 14 of 15
- Attachment 7 Technical Justification 15 of 15
- Attachment 8 Benefit and Cost Analysis 1 of 10
- Attachment 8 Benefit and Cost Analysis 2 of 10
- Attachment 8 Benefit and Cost Analysis 3 of 10
- Attachment 8 Benefit and Cost Analysis 4 of 10
- Attachment 8 Benefit and Cost Analysis 5 of 10
- Attachment 8 Benefit and Cost Analysis 6 of 10
- Attachment 8 Benefit and Cost Analysis 7 of 10
- Attachment 8 Benefit and Cost Analysis 8 of 10
- Attachment 8 Benefit and Cost Analysis 9 of 10
- Attachment 8 Benefit and Cost Analysis 10 of 10
- Attachment 9 Preference 1 of 1
- Attachment 2 Adopt 1 of 1
- Prop 84 Round 2 Grant Agreement (New)
- Prop 84 Round 2 Implementation Grant Application
- Drought
- Prop 84 Drought Grant Application
- Att1_DG_Authorization_Eligibility_01of16
- Att1_DG_Authorization_Eligibility_02of16
- Att1_DG_Authorization_Eligibility_03of16
- Att1_DG_Authorization_Eligibility_04of16
- Att1_DG_Authorization_Eligibility_05of16
- Att1_DG_Authorization_Eligibility_06of16
- Att1_DG_Authorization_Eligibility_07of16
- Att1_DG_Authorization_Eligibility_08of16
- Att1_DG_Authorization_Eligibility_09of16
- Att1_DG_Authorization_Eligibility_10of16
- Att1_DG_Authorization_Eligibility_11of16
- Att1_DG_Authorization_Eligibility_12of16
- Att1_DG_Authorization_Eligibility_13of16
- Att1_DG_Authorization_Eligibility_14of16
- Att1_DG_Authorization_Eligibility_15of16
- Att1_DG_Authorization_Eligibility_16of16
- Att2_DG_Drought_Impacts_1of1
- Att3_DG_Project_Justification_1of5
- Att3_DG_Project_Justification_2of5
- Att3_DG_Project_Justification_3of5
- Att3_DG_Project_Justification_4of5
- Att3_DG_Project_Justification_5of5
- Att4_DG_Work_Summary_1of1
- Att5_DG_Budget_Summary_1of1
- Att6_DG_Schedule_1of1
- Att7_DG_Program_Preferences_1of1 Final
- Att8_DG_DAC_Assistance_1of1
- Prop 84 2014 Drought Round Grant Agreement (New)
- Prop 84 Drought Grant Application
- 2015
- Prop 84 2015 Implementation Grant Application (New)
Prop 50
- Prop 50 Grant Agreement REVISED 2016 Jan 06 (New)
- Prior Prop 50 Grant Agreement Versions…
- Step 2 Prop 50 Implementation Grant Application
- 00. Step 2 FAAST Application
- Attachment 01 – Authorization and Eligibility Requirements
- Attachment 02 – Consistency with Minimum IRWM Plan Standards
- Attachment 03 – Adopted IRWM Plan and Proof of Formal Adoption
- Attachment 04 – Consistency with IRWM Plan Standards
- Attachment 05 – Work Plan
- Attachment 06 – Budget
- Attachment 07 – Schedule
- Attachment 08 – Scientific and Technical Merit
- Attachment 09 – Monitoring, Assessment, and Performance Measures
- Attachment 10 – Economic Analysis – Water Supply and Water Quality Benefits
- Attachment 11 – Other Expected Benefits
- Attachment 12 – Program Preference
- Attachment 13 – Statewide Priorities
- Attachment 14 – Changes from Step 1 to Step 2 (If Applicable)
- Attachment 15 – Modification of River or Stream Channel (If Applicable)
- Attachment 16 – CALFED ROD consistency (If Applicable)
- Attachment 17 – Letters of Support or Opposition (If Applicable)
- Proposal Acronyms
- Step 2 FAAST Application Form
- 01. Central Basin Southeast Water Reliability Project
- 02. JWPCP Marshland Enhancement Project
- 03. Large Landscape Water Conservation… Project
- 04. Las Virgenes Creek Restoration Project
- 05. Malibu Creek Watershed Water Conservation… Project
- 06. Morris Dam Water Supply Enhancement Project
- 07. North Atwater Creek Restoration Project
- 08. Pacoima Wash Greenway – 8th Street Project
- 09. San Gabriel Valley Riparian Habitat Arundo Removal Project
- 10. Solstice Creek Steelhead Habitat Restoration Project
- 11. South Los Angeles Wetlands Park Project
- 12. Whittier Narrow WRP UV Disinfection Facilities Project
- 13. Wilmington Drain Restoration Project
- 00. Step 2 FAAST Application
Region Acceptance Process
Maps
- Prop 50 and 84 Projects (PDF: 7.4 MB) (Updated)
- Prop 50 Project Locations (PDF: 1 MB)
- Prop 84 Round 1 Project Locations (PDF: 1.6 MB)
- Prop 84 Round 2 Project Locations (PDF: 2 MB)
- Prop 84 Round 3 Project Locations (PDF: 8.4 MB) (New)
- State Assembly (PDF: 1.3 MB)
- State Senate (PDF: 1.3 MB)
- US Congress (PDF: 1.3 MB)